July 27 2009, the car is completely disassembled, not even one bolt or wire left on the chassis, started cutting out all the rust and replacing frame pieces with new metal.
That was the start, the car sat during the winter, very little was done to the chassis, but some things were done to the subframe. Jan 23rd 2010 the frame was blasted and engine test fitting was started, I had to cut up and custom make some new parts to support the engine.